01
02
03
04
05
06
07
08
09
10
11
12
Connecting Communities

Providing Economic, environmental and safety benefits for California’s Capital Region

State-of-the-art transportation corridor connecting Interstate 5 to Highways 16 and 50 through Sacramento and El Dorado Counties.

Project at Glance
34 
Mile Expressway
11,300  
New jobs between 2021 to 2030
$770M 
New labor income
$1.8B 
Economic Output
Project Overview

Connecting communities, shortening commutes

Connecting Sacramento County, El Dorado County, the City of Elk Grove, the City of Rancho Cordova, and the City of Folsom, the 34-mile Capital SouthEast Connector Expressway is designed to improve road safety and shorten travel times in a congested part of the Sacramento area's transportation system that is prone to accidents and flooding.

Improves road safety

Modernized infrastructure reduces accident risk across the corridor.

Shortens travel times

Direct connections between major regional employment centers.

Relieves congestion

Reduces pressure on existing arterial roads and highways.

Reduces bottlenecks

Smooths regional traffic flow at critical intersections.

Map of Sacramento County showing cities, highways, airports, and natural landmarks with major roads highlighted.
The Route

A 34-mile corridor across two counties

The Capital SouthEast Connector Expressway runs 34 miles from Interstate 5 in Elk Grove to Highway 50 in El Dorado Hills, crossing State Route 99 and State Route 16 (Jackson Highway) along the way. The full corridor delivers four travel lanes, modernized intersections, and a continuous Class 1 multi-use path for pedestrians, bicyclists, and equestrians, ending at the Silva Valley interchange.

Environmental Benefits

Designed with the land in mind

The Connector reduces greenhouse gases, pollutant emissions, and vehicle miles traveled. Because the expressway is access-controlled, with no new driveways or on/off ramps along the corridor, the project actively prevents unplanned development from spreading onto adjacent farmland. Combined with $15 million in Measure A conservation funding and the South Sacramento Habitat Conservation Plan, this approach preserves hundreds of acres of working farmland, protects Sacramento County's locally grown food supply, and creates an interconnected preserve system that supports plant and wildlife species and rural ranching operations.

Reduces emissions and greenhouse gases
Reduces vehicle miles traveled
Preserves working farmland
Creates an interconnected preserve system
A highway overpass and a smaller footbridge over a grassy ditch under a bright blue sky.
Aerial view of a suburban area with housing developments, roads, and a large reservoir in the background.
Economic & Financial Benefits

Driving regional prosperity

By safely connecting communities east of I-5 and Hwy 99 and south of Hwy 50, the Connector will produce substantial economic and financial benefits — improving the ease and speed of goods transportation and increasing regional economic vibrancy.

$1.8B 
Economic output
11,300 
New jobs between 2021 to 2030
$770M 
New labor income
$1.1B 
New value added
$80M 
New state & local taxes
Safety & Regional Security

Built for safer travel and emergency response

The Capital SouthEast Connector Expressway will improve safety by converting two-lane rural roads — not designed for current day traffic volumes — into a modern four-lane expressway, projected to reduce crash rates by nearly 40 percent. It also improves emergency response times for South Sacramento County and provides an alternate evacuation route during emergencies.

Reduces crash rates by ~40%
Improved emergency response routes
Alternate evacuation corridor
 
The Directors

Elected officials, regional stewardship.

Each director is appointed by their member agency from their elected body, bringing local accountability to a regional project.

Patrick Hume
Patrick Hume
Supervisor
George Turnboo
George Turnboo
Supervisor
Sergio Robles
Sergio Robles
Councilmember
Mike Kozlowski
Mike Kozlowski
Councilmember
Garrett Gatewood
Garrett Gatewood
Councilmember
Governance

JPA Board Meeting Materials

May 2026

May 29, 2026 Board Meeting

February 2026

February 23, 2026 Board Meeting

November 2025

November 14, 2025 Board Meeting

August 2025

August 29, 2025 Board Meeting

Featured Media & Resources

Inside the Connector

Back to Resources
In The Media
3:53 min
Step to the Future with Congressman Ami Bera

Go behind the scenes of the Connector project, from engineers and contractors to community leaders and elected officials.

Podcast
EP 26
40 min
Why Sacramento Must Think Like One Region (James Corless)
Guest
James Corless
Back to Resources
Podcast
EP 26
40 min
Why Sacramento Must Think Like One Region (James Corless)
Guest
James Corless